exterior of building under construction

Taking Shape: An Early Peek at the Advanced Engineering Building

Summer sees significant progress on what will soon become UNLV Engineering’s signature new facility; AEB set to open January 2024.

With 3,400 students and continual growth, UNLV's Howard R. Hughes College of Engineering will get more spaces for teaching, research, and collaborations once the new Advanced Engineering Building opens by the 2024 spring semester. (Becca Schwartz/UNLV)

You Might Also Like

students walking down stairs past UNLV signage, with the Flashlight sculpture in the background
Campus News | September 2, 2026

A selection of prominent headlines featuring UNLV experts from July and August.

man in suit jacket posing in grassy area outside. Red UNLV letters visible in the distance.
Campus News | September 1, 2026

Lakshmi Reddi, an engineer with a ‘lifelong love affair’ with the arts, on how he came to understand the value of education.

A desert cottontail rabbit in the landscaping.
Campus News | August 28, 2026

Meet some of the Mojave Desert critters that call our campus home.